Resources
The following list includes reports, guides, manuals, and brochures available for download.
- 5 Year CIP
- 2025 Communications Plan
- Audited Financials
- Biocycle Farm Brochure
- Biosolids Management Brochure
- Biosolids Management Plan for MWMC (2001)
- Budget for Fiscal Year 2025-2026
- Bylaws
- Crop Manual for Hybrid Poplar at the MWMC Biocycle Farm (2008)
- Drone Program – UAS Operations Manual Final
- Drone Program – UAS Policy for Operation Final w-signature
- Facilities Plan Fact Sheet
- Financial Plan (2019)
- GeoDesign Geotech Report
- Greenhouse Gas Inventory Report (2025)
- Greenhouse Gas Inventory Report (2014)
- Industrial Pretreatment Fact Sheet
- 2005 Intergovernmental Agreement – Amended 2026
- Regional Wastewater Program Monthly Report
- SDC Methodology Update (2009)
- SDC Fee Schedule (Effective July 1, 2025)
- Strategic Plan 2020-2024
- Triple Bottom Line Assessment of Thermal Load Mitigation Alternatives (2014)
- Wastewater Treatment Brochure
Facilities Plan
2026 Comprehensive Facilities Plan
We are currently working on creating the next 20-year Comprehensive Facilities Plan. It is expected to be completed in 2026. More information about this effort is available on the project page.
2014 Partial Facilities Plan Update
This Partial Facilities Plan was prepared to provide an analysis of the critical wastewater treatment process capacities and to provide a technical basis for interim-term planning decisions as the MWMC approached its renewal of the Eugene-Springfield Regional Water Pollution Control Facility’s (WPCF’s) National Pollutant Discharge Elimination System
(NPDES) permit.
2004 Comprehensive Facilities Plan
The MWMC Facilities Plan is a large document. There are two volumes the Facilities Plan and Technical Memorandums/Appendixes. The volumes are broken down into sections for easy computer accessibility. The sections are based on chapters, tables, and figures of the plan.
The 2004 Plan provided planning direction through 2024 and is now aging out. The 2004 plan is available for review by chapter and appendices below.
Chapters
- Cover, Table of Contents, Exec. Summary
- Chapter 1: Introduction, Purpose and Need
- Chapter 2: Study Area Characteristics
- Chapter 3: Existing Wastewater Facilities
- Chapter 4: Wastewater Characteristics
- Chapter 5: Basis of Planning
- Chapter 6: Alternatives
- Chapter 7: Recommended Plan
- Chapter 8: Financial Strategy
- Chapter 9: Environmental Report
- Chapter 10: References
Technical Memorandums and Appendixes
- TM1: Wet Weather Peak Flow Analysis
- TM2: Preliminary Screening
- TM3: Flow & Load Projections
- TM4: Water Quality Regulatory Update
- TM5: Pretreatment Expansion Alternatives
- TM6: Secondary Treatment Alternatives
- TM7: Secondary Treatment Alternatives
- TM8: Secondary Clarifier Alternatives
- TM9: Peak Flow Alternatives
- TM10: Disinfection Alternatives
- TM11: Odor Control Alternatives
- TM12: Thermal Load Evaluation
- TM13: Analysis of Biosolids
- TM14: Biosolids & Effluent Reuse Alternatives
- TM15: Biosolids & Effluent Reuse Cost
- Appendix A: NPDES Permit
- Appendix A: Temperature Management Plan
- Appendix A: Biosolids Management Plan
- Appendix B: DEQ Letter
- Appendix C: Population Projections

