Beneficial Reuse Site

aerial of beneficial reuse site

The Beneficial Reuse Site (BRS) was built in 1983 to remove high-strength industrial wastewater from the wastewater treatment facility on a seasonal basis. The 290-acre site is designated for farm use and also contains a 14-acre, 57 million gallons, storage lagoon. The site is approximately one mile from the Biosolids Management Facility.

Currently, the site is leased to a local farmer and forage producer to ensure that the site is continuously farmed using sound farm management practices.

Comments are closed.

Close Search Window